Construction RFI, submittal and change order management
RFIs answered on time, submittals approved before the work, change orders priced and signed, and the daily log written while the day is fresh.
One click opens a free 30-day workspace with RFI log and sample data. No credit card.
The work between the systems
- RFIs wait on the architect and the schedule slips.
- Change orders are verbal until the dispute.
- Daily logs are written on Friday from memory.
Built for this, changed by your team
Neuclon connects the RFI log, submittals, change orders, daily logs and punch list. It flags RFIs past their response date, submittals needed for upcoming work and unsigned change orders, and the agent drafts the follow-up to the right party.
Try RFI log with sample data
Filter by what needs attention, switch to the board, open a record to see what its agent would do. The walkthrough shows the same tool being built and run.
What you get
How the day goes
- 7:00Two RFIs are past their response date; the architect gets a reminder with the schedule impact.
- 10:30The foreman logs a change in scope from the field; a change order opens with photos.
- 14:00A submittal for next week’s steel is still pending: it is flagged.
- 17:00The daily log is drafted from the day’s entries for the superintendent to confirm.
An illustrative day. Your rules, people and systems set the details.
What to measure
- RFI response time
- Unsigned change order value
- Submittals late for their work
- Punch items open at handover
Pick one of these, agree the baseline on day one, and measure it after 30 days on your own data. How the 30-day Sprint works.
Frequently asked
Can subcontractors use it?
Yes, with limited roles, or they can answer through emails the agent sends.
Can we start from our own spreadsheets?
Yes. Import Excel or CSV and Neuclon maps the columns to the fields, or attach the sheet when you ask for the tool and it is designed around it.
Can we change it ourselves?
Yes. Ask in plain words, for example “add a downtime reason field” or “flag anything open more than 7 days”. Every version is kept.
How long does it take to start?
Minutes for the trial: it opens with sample data you can replace. A 30-day Sprint proves one improvement on your own data.
More solutions
Everything Neuclon does for construction & building services · All solutions · All apps and templates
Start with this in your own workspace
Free for 30 days. It opens with sample data you can replace with yours, and every Business feature is included.